We are finished repairing the downstairs shower. Re-sealed the whole floor, so hopefully no more problems with that.
The bathroom upstairs is almost done. The toilet is in, as is the sink and vanity. We had the electrician come today to help with the wiring and Brian was able to get the fan and the lights working this afternoon.
We found someone in Seaview to make the missing spindles for the stairs. He did a great job and that is another job checked off the list. I have painted them with primer, and hope to get them installed soon.
We have cleaned out another 5 or 6 boxes and put stuff away, sure a good feeling to get it all out of storage. Well not ALL, but we have put a big dent in it.
No comments:
Post a Comment