The floor is done in the bedroom and the wardrobe is up! Most of the baseboard is down as is the crown molding. We ran out of both so will pick up more at Lowes this Friday. The bed is just about all painted and ready to set up. Brian needs to do a little more cutting to make it work. We hope to get moved in there over the weekend! Yippee!
Have been working outside a lot since the weather has been good. Changing some of the flower beds and paths. It is looking good!