The rain cleared up long enough to get the tree moved, now we will have more room in the garden and not so much shade on the plants.
Discovered a problem with the shower downstairs, some of the grout had come out from between a few tiles, so Brian cleaned out a bunch of the old grout, and replaced two tiles, and we will have to re-grout it before we can use it again...as I have said before it is always something.
The toilet is attached in the new bathroom, but no water lines to it yet, and we got more trim and some of the baseboard down and a curtain rod up. It all adds up to a bathroom that is almost finished. I did take a bath, and how HEAVENLY was that!
A journal of all the happenings as we restore our 1895 Victorian into a bed and breakfast.
Wednesday, February 16, 2011
Saturday, February 12, 2011
Amazing! We have a working bathtub in the house, haven't used it yet, but will very soon. I put the wallpaper border up today with Emily's help. It looks great. The vanity top is glued down and ready for the sink and the plumbing.
Had to take some time Friday to repair a leak in the water line about 1/3 down the driveway. Always something! Em and John were here this weekend to help us move a tree out of the garden, but it has been raining too hard.
Had to take some time Friday to repair a leak in the water line about 1/3 down the driveway. Always something! Em and John were here this weekend to help us move a tree out of the garden, but it has been raining too hard.
Sunday, February 06, 2011
All of the laminate is up in the bathroom and it really looks nice. The bathtub is in place and Brian is working on the plumbing for the bathtub, and getting a top built for the vanity. I finished sanding and staining the back splash for the vanity and it is ready to go. All of the pieces are coming together and we hope to have a finished bathroom by this time next week.! It will be so nice to be able to cross another room off our list, but most of all I can take a bath!!! I have really missed having a good soak!
Friday, February 04, 2011
Finished laying the floor in the upstairs bathroom and have one piece of laminate up on the wall. I have started sanding the rest of the floor so we can stain it later this week.
Brian finished the trim on the skylight in the downstairs bathroom, it looks so good!
Still unpacking boxes, but at a slower rate, all the cabinets in the living room and dining room are pretty much full, so being selective about what I take out, it must have a place to go.
Brian finished the trim on the skylight in the downstairs bathroom, it looks so good!
Still unpacking boxes, but at a slower rate, all the cabinets in the living room and dining room are pretty much full, so being selective about what I take out, it must have a place to go.